Catawba Wateree Water Management Group 2015 Annual Report

Raw Water Intake Contingency Plan

Back to Project List

These evaluations were completed in two phases. Phase 1 included an evaluation of existing intake conditions for all eighteen CWWMG public water suppliers, while Phase 2 included the development of raw water intake contingency plans for sixteen or the eighteen suppliers as outlined below.

PHASE 1 — Evaluation of Existing Conditions (2013-2014)

  • Evaluated and confirmed raw water intake capabilities
  • Evaluated existing contingency plans and measures
  • Completed preliminary evaluation of existing water supply interconnections
  • Prioritized members' need for a raw water intake contingency plan

PHASE 2 — Raw Water Intake Contingency Plan Development (2014-2015)

  • Developed formal raw water intake contingency plans for sixteen water suppliers
  • Identified and reported on joint contingency response project opportunities for the full CWWMG membership

Phase 1 was completed in early 2014; Phase 2 was completed in early 2016. Because these documents contain restricted sensitive public security information for critical water supply infrastructure, they have not been released publicaly but provide valuable information for the CWWMG member utilties.